See POLREP 21 for Site Description information
Removal activities are completed at the Site. EPA removed a total of 530 tons of asbestos contaminated soil and 10 tons of tree roots/stumps with asbestos from the ravine portion of the Site under Special Bulletin A – Polrep 20. Removal activities conducted in the ravine are documented in Polreps 21 through 25.
An After Action Report for the WRG4 Vermiculite Site including the removal actions at the ravine has been prepared.
No further removal activities are planned for the Site.
|